1426 Ives Pl SE
I bought 1426 Ives Pl SE on 12/08/2010.
This is a photo chronology of the demo and remodeling.
Tuesday, January 17, 2012
new front light
my first foray into electrical work
and it works!
orleans
for reference: the temporary light
some carpentry
hardwood ash, ready to be ripped down
drilling pocket holes
i have a vice, and it's carpentry
ready to be tweaked: disassembled, planed, reassembled, sanded, oiled
it's all ready to be hung on the wall by the front door, but i don't have photos of the finished product.
Monday, January 9, 2012
finished stools
strips ready to be webbed
1 of 2
fin. feel free to commission one.
Wednesday, January 4, 2012
upper deck, shower door, coffee table
2nd floor deck
the view
shower door in reflection
concrete mold for living room coffee table (with level)
and 100 lbs of concrete
Tuesday, January 3, 2012
deck and vent
just arrived today from IA
sorry for the blur
stools, part 1
these are going in the guest bedroom as coffee tables/extra seating. they will each have a dark gray woven vinyl top.
furniture
turns out the sette is made in america, too
cluttered dining room
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)