I bought 1426 Ives Pl SE on 12/08/2010.

This is a photo chronology of the demo and remodeling.

Monday, March 28, 2011

Footer: poured

After the excavation sitting empty for almost 2 weeks, the footer was finally poured in Friday.  Let's hope the rest of the project doesn't drag out this long.