I bought 1426 Ives Pl SE on 12/08/2010.

This is a photo chronology of the demo and remodeling.

Thursday, September 29, 2011

lights, furnace, painting!

master bedroom

master suite

stairwell

furnace

oops.  primer on the back wall.  ah well...

moving along

the stair rough in is complete

ivy grows (not)

prepping for painting

tub: made in the usa

interior door knobs

bedroom speaker controls

Monday, September 26, 2011

i have stairs

When my new contractor came to do an estimate on the work a couple weeks ago, he was very concerned that the stairs hadn't been installed.  He said it is usually indicative that there is an issue with the space.  Yesterday, he fixed the issue.



i gain some space in the upstairs hallway.  notice the new double joists.

speaker system

more spaghetti

Windows, Part II

Sunday, September 18, 2011

Footer: poured (part II)


480 lbs of  sakrete really made the honda sink low